Main Reference Projects: Construction
Page 1 - Page 2
| Client | Project |
|---|---|
| ITALFERR | High Speed Railway Milan-Genova - Preliminary design |
| ITALFERR | Torino-Lione Railway - Settimo Torinese-Bruzolo Section - Preliminary design, quarries and landfills localization |
| ITALFERR | Bologna railroad node, lot 13 - Executive design |
| ITALFERR | Palermo railroad node - Final Design |
| ITALFERR | Orte-Falconara Railway - Spoleto-Campello and Castelplanio-Monte carotto Sections - Construction works |
| ITALFERR | Railway bridge over Po river at Pontelagoscuro - Consolidation of piers |
| ITALFERR | High Speed Railway Padova-Mestre - Final Design, quarries and landfills localization |
| ITALFERR | Genova-Ventimiglia Railway - Andora-San Lorenzo a Mare Sections - Final Design |
| ITALFERR | Vesuvio Railway - Final Design |
| ITALFERR | Guidelines for construction site set up stage |
Selected Security Plans
Security Plan editing during works planning, security and health when carrying out works as from the Italian decree law D.Lgs. n.494 18/8/1996 and following D.Lgs. 528/99.
| Client | Project |
|---|---|
| ACNA CHIMICA ORGANICA | ACNA di CENGIO (SV) facility - Geognostic investigations to define continuous slurry walls characteristics - Construction of continuous slurry walls and drainage trenches for the confinement of contaminated soil |
| AEM TORINO | Geognostic investigations and monitoring system - Rosone landslide |
| AMIU - GENOVA | Scarpino Landfill (GE) - Landfill embankment foot: restoration interventions |